Baldung Grien Middle School - HŒRDT (67)

SOPRASOLAR Fix Evo Tilt

At Baldung Grien Middle School in Hoerdt, the Fix Evo Tilt solution was chosen for its ease of installation.

The pre-assembled brackets, simplified layout, and no-drilling design enable a quick, clean, and perfectly controlled installation.
An ideal solution for projects on occupied sites, where service continuity and safety are essential.

  • Project Owner: Collectivité Européenne d’Alsace
  • Integration System: SOPRASOLAR Fix Evo Tilt
  • Total Capacity: 124 kWp